3
Shared Docs
3
Same-Page
9 / 3
Mentions
when it will be replaced. 2 EFTA00577584 PALM BEACH STATUS ITEM COMMENT + Update + JE Plse advise 1. Landscape Lighting i) Complete. Is JE happy with it? + Update 2. Furniture for Paula Epstein ii) Triconfort furniture will be delivered April 17. + Update 3. Triconfort Cushions
Smelling Plants xxviii) Flowers. Gardenias are growing. Jasmines will be planted after the gym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly Pavement Dust Prevention xxx) Process on hold whilst gym is being erected. Miles continues to spra
ym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly P
attached quote Coverage 4 Update 10. Repair crack in kitchen tiles x) Custom tiles will be delivered by April 21. + NC 11. Water Rights 12. Phase Power/Water Well xi) Shannon has received notice for the Dakota well application from the Office of the State Engineer. Approximately one half of the power l
when it will be replaced. 2 EFTA00577634 PALM BEACH STATUS ITEM COMMENT + Update + JE Plse advise 1. Landscape Lighting i) Complete. Is JE happy with it? + Update 2. Furniture for Paula Epstein ii) Triconfort furniture will be delivered April 17. + Update 3. Triconfort Cushions
Smelling Plants xxviii) Flowers. Gardenias are growing. Jasmines will be planted after the gym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly Pavement Dust Prevention xxx) Process on hold whilst gym is being erected. Miles continues to spra
ym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly P
attached quote Coverage 4 Update 10. Repair crack in kitchen tiles x) Custom tiles will be delivered by April 21. + NC 11. Water Rights 12. Phase Power/Water Well xi) Shannon has received notice for the Dakota well application from the Office of the State Engineer. Approximately one half of the power l
installation 15 April. FYI: Installation of the diffusers expected to take two weeks, the room will have to be repainted and require scaffolding, JE to advise once the diffusers are on sight, most appropriate two week for week to be complete. + Update 2. Oxygen supply iii) Oxygen tank had to
quired. Suggested attendees: Miles, Boscoe, Bruce, Kurt and Trevor. Kathy suggested 18 April, please advise. + NC 27. Wind Generator xxxii. Mr. Epstein has placed positioning on hold. + NC 28. Poly Pavement Dust Prevention xxxiii. Process on hold whilst gym is being erected. Miles continues to
please advise. + NC 27. Wind Generator xxxii. Mr. Epstein has placed positioning on hold. + NC 28. Poly P
attached quotation = $11,031.00. + Update 10. Repair crack in kitchen tiles xiv) Tiles will be completed by 21 April + NC 11. Water Rights 12. Phase Power/Water Well xv) Shannon has received notice for the Dakota well application from the Office of the State Engineer. xvi) Approximately one half of the pow
Entities connected to both Jeffrey Epstein and Phase Power/Water
Darren Indyke
PERSONLarry Visoski
PERSON
Ghislaine Maxwell
PERSON
Alan Dershowitz
PERSON
Teterboro
LOCATION
Samantha Power
PERSON
Oliver Stone
PERSON
Les Wexner
PERSONNicholas
PERSON
St. John
LOCATIONNanna
PERSONLandscaping
PERSONYamaha
ORGANIZATIONMiles
PERSON
Jerome
PERSONMain House
ORGANIZATIONPascal
PERSONDakota
ORGANIZATIONSerge
PERSONAlan Stopek
PERSON