when it will be replaced. 2 EFTA00577584 PALM BEACH STATUS ITEM COMMENT + Update + JE Plse advise 1. Landscape Lighting i) Complete. Is JE happy with it? + Update 2. Furniture for Paula Epstein ii) Triconfort furniture will be delivered April 17. + Update 3. Triconfort Cushions
Smelling Plants xxviii) Flowers. Gardenias are growing. Jasmines will be planted after the gym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly Pavement Dust Prevention xxx) Process on hold whilst gym is being erected. Miles continues to spra
ym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly P
be delivered by April 21. + NC 11. Water Rights 12. Phase Power/Water Well xi) Shannon has received notice for the Dakota well application from the Office of the State Engineer. Approximately one half of the power line installation has been completed. 4 Update 13. "Z" to be lit up. xii) Approval given. Special light was
when it will be replaced. 2 EFTA00577634 PALM BEACH STATUS ITEM COMMENT + Update + JE Plse advise 1. Landscape Lighting i) Complete. Is JE happy with it? + Update 2. Furniture for Paula Epstein ii) Triconfort furniture will be delivered April 17. + Update 3. Triconfort Cushions
Smelling Plants xxviii) Flowers. Gardenias are growing. Jasmines will be planted after the gym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly Pavement Dust Prevention xxx) Process on hold whilst gym is being erected. Miles continues to spra
ym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly P
be delivered by April 21. + NC 11. Water Rights 12. Phase Power/Water Well xi) Shannon has received notice for the Dakota well application from the Office of the State Engineer. Approximately one half of the power line installation has been completed. 4 Update 13. "Z" to be lit up. xii) Approval given. Special light was
installation 15 April. FYI: Installation of the diffusers expected to take two weeks, the room will have to be repainted and require scaffolding, JE to advise once the diffusers are on sight, most appropriate two week for week to be complete. + Update 2. Oxygen supply iii) Oxygen tank had to
quired. Suggested attendees: Miles, Boscoe, Bruce, Kurt and Trevor. Kathy suggested 18 April, please advise. + NC 27. Wind Generator xxxii. Mr. Epstein has placed positioning on hold. + NC 28. Poly Pavement Dust Prevention xxxiii. Process on hold whilst gym is being erected. Miles continues to
please advise. + NC 27. Wind Generator xxxii. Mr. Epstein has placed positioning on hold. + NC 28. Poly P
l be completed by 21 April + NC 11. Water Rights 12. Phase Power/Water Well xv) Shannon has received notice for the Dakota well application from the Office of the State Engineer. xvi) Approximately one half of the power line installation has been completed. 13. "Z" to be lit up. xvii) Approval given. Special light was ord
Entities connected to both Jeffrey Epstein and the Office of the State Engineer
Darren Indyke
PERSONLarry Visoski
PERSON
Ghislaine Maxwell
PERSON
Alan Dershowitz
PERSON
Teterboro
LOCATION
Samantha Power
PERSON
Oliver Stone
PERSON
Les Wexner
PERSONNicholas
PERSON
St. John
LOCATIONNanna
PERSONLandscaping
PERSONYamaha
ORGANIZATIONMiles
PERSON
Jerome
PERSONMain House
ORGANIZATIONPascal
PERSONDakota
ORGANIZATIONSerge
PERSONAlan Stopek
PERSON