4
Shared Docs
4
Same-Page
9 / 4
Mentions
To: Silvina Roysto From: Jeffrey Epstein Sent: Mon 5/11/2009 1:34:36 PM Subject: Re: Consultants for Hammam Project yes On Mon, May I I, 2009 at 9:30 AM, Silvina Royston Jeffrey, wrot
effrey Epstein Sent: Mon 5/11/2009 1:34:36 PM Subject: Re: Consultants for Hammam Project yes On Mon, May I I, 2009 at 9:30 AM, Silvina Royston Jeffrey, wrote: In the interest of maintaining our team of consultants consistent for both the House Expansion and for the Hammam, I have contacted Warwic
To: Silvina Roysto From: Jeffrey Epstein Sent: Mon 5/11/2009 1:34:36 PM Subject: Re: Co
mmam, I have contacted Warwick Wicksman at Gensler to ask if Gensler and their consultants would be interested in working with Hasan Khan to produce the Design Development and Construction Sets, which Hasan and Andrew are not able to do on their own. Gensler has done such collaboration and is interested. May I forwar
t shall identify a representative authorized to act on behalf of the Architect with respect to the Project. If no representative is identified, then Jeffrey &debate. AIA shall be the Architect's project representative. Approved Project Scope. The Project Scope shall be all elements of the Project to be des
ure Accepted by: frig 7:7 "--Date: 01/15/2019 Jeffrey Boschulte for Boschulte Design Studio Date: Pr
ct will provide one (1) meeting to present and discuss the Design Development drawings. The Architect will prepare a maximum of two (2) revisions to the Design Development drawings and meet to present each revision. Any additional revisions during the Design Development Phase shall be considered Additional Services.
t shall identify a representative authorized to act on behalf of the Architect with respect to the Project. If no representative is identified, then Jeffrey &debate. AIA shall be the Architect's project representative. Approved Project Scope. The Project Scope shall be all elements of the Project to be des
ature Accepted by: IrkirriaterDate: 01/14/19 Jeffrey Boschulte for Boschulte Design Studio Proposal
ct will provide one (1) meeting to present and discuss the Design Development drawings. The Architect will prepare a maximum of two (2) revisions to the Design Development drawings and meet to present each revision. Any additional revisions during the Design Development Phase shall be considered Additional Services.
, up to 2 3 2015 shall be attached. This Agreement entered into as of the day and year first written above. init. OWNER (Signature) (Signature) Jeffry Epstein Donna C. deJo NCARB . President or Managing Partner ,Executive Vice President (Printed name and title) (Printed name and title) AIA Document
. init. OWNER (Signature) (Signature) Jeffry Epstein Donna C. deJo NCARB . President or Managing Pa
h Group Staff 3 deJongh Group Staff 4 Engineering, or Specialty Consult Item Totals TOTALS PHASE ONE TASKS 6.0 Develop individual projects to the Design Development and Construction Documents stages for Contractors Bid and eventual Construction and Construction Administration phases as follows: $ - 6.1 a. P
Entities connected to both Jeffrey Epstein and the Design Development

Richard Kahn
PERSON
Samantha Power
PERSON
Legislature
ORGANIZATIONthe American Arbitration Association
ORGANIZATIONJeffrey Boschulte
PERSONArchitect
ORGANIZATIONMaster Planning
ORGANIZATIONSubstantial Completion
ORGANIZATIONConstruction Administration
ORGANIZATIONPre-Design Services
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONthe Schematic Design
ORGANIZATIONConstruction Industry Arbitration Rules
ORGANIZATIONFermi
LOCATIONBoschulte Design Studio
ORGANIZATIONInterior Design Services
ORGANIZATIONthe Tams and Conditions
ORGANIZATIONLEED Certification
ORGANIZATIONthe Building Department
ORGANIZATIONthe Construction Industry Mediation
ORGANIZATION