6
Shared Docs
6
Same-Page
20 / 6
Mentions
From: Larry Visoski < Sent: Saturday, September 28, 2013 10:35 PM To: Eric Roth Cc: Jeffrey Epstein; Jay Massar Subject: Re: Some of the Squawks - please read GIV will return to Islip Wednesday Oct=3rd evening 7:30pm repairs, The aircraft will be
in flight. (doors under bathroom sink.) =span style="font-size: lOpt; font-family: Arial, sans-serif;"> R/H #2 Master Switch Panel-c/=pan> Tables- JE noted difficulty in the deployment / stowing of t=e side ledge tables in flight. The VIP tray table lid does not open DURING f=ight under pressurize
On Sep 28, 2013, at 12:13 PM, Eric Roth <[email protected] <mailto:[email protected]> wrote: Jay and Larry, I ha=e exchanged numerous e-mails with Jeffrey last night and this morning. = Further, Jeffrey and I just spoke on the phone discussing a few of the squ=wks. By no means is below the total l=st
tljet> <image009.jpg> <http://www.facebook.com/intljet> 2221 Smithtown Avenue= Long Island MacArthur Airport, Ronkonkoma, New York 11779 From: Jef=rey Epstein Imailto:jeevacation@gm=il.com <mailto:[email protected]> j Sent: Saturday, September 28, 2013 6:32 AM To:=/b> Eric Roth; Ivjet Subject: Re: L
al, may be atto=ney-client privileged, may constitute inside information, and is intende= only for the use of the addressee. It is the property of Jeffrey Eps=ein Unauthorized use, disclosure or copying of this communication or=any part thereof is strictly prohibited and may be unlawful. If you have=rece
r 28, 2013 10:35 PM To: Eric Roth Cc: Jeffrey Epstein; Jay Massar Subject: Re: Some of the Squawks -
this list. #1 item Nose Camera nee=s be addressed during this visit. Divan- JE notes that the foam build up=on the GIV is different than the Glib. Main Cabin Area Fluorescent Li=hting- As identified prior to flight, there are certain light= in the upwash / downwash lighting that are inoperative and/or int
From: Jeffrey Epstein <[email protected]> Sent: Saturday, September 28, 2013 11:06 PM To: Larry Visoski Subject: Re: Some of the Squawks - please read air gaspe
eploy the divan to=the berthing position. I want to open up both divans to personally see andridentify the foams that were used. Bottom line is that Jeffrey wants us=to use the foam from the Glib in the new upholstery for the GIV. (while op=ning the divan, the rear seat divan cushion does not fit into pl
, w=en stowing table the two wood surfaces meet. - VI= tray table still rattles -Need (phone lightening=cord phone charger hard wired for VIP seat, JE mentioned a lightening cord=to come up from bottom of cup holder, since his phone sits in Cup holder d=ring flight. -See attached photo, JEE reques
se of the addressee. It is the property of Jeffr=y Epstein Unauthorized use, disclosure or copying of this
etween the top of the entry rain curtain and the headliner =ept to an absolute minimum to help keep the noise out from the entry door =o the cabin. Main Cabin Area Fluorescent Lighting-<=u> As identified prior to flight, there are =ertain lights in the upwash / downwash lighting that are inoperative and/o
From: Richard Kahn Sent: Monday, May 22, 2017 5:55 PM To: Jeffrey E. Cc: Larry Visoski Subject: Fwd: seat prices please advise thank you Richard =ahn HBRK Associates Inc. 575 Lexington =venue 4th Floor New York,
d Kahn Sent: Monday, May 22, 2017 5:55 PM To: Jeffrey E. Cc: Larry Visoski Subject: Fwd: seat prices
ahn IMIIMMII IMEn wrote: Date: 4.24.17 Client: JE Aircraft: G550 Serial Number: 5173 soft goods
d Kahn Sent: Monday, May 22, 2017 5:55 PM To: Jeffrey E. Cc: Larry Visoski Subject: Fwd: seat prices
per Sidewall Panel $ =,098.00 314 R/H Fwd Lay Potty Seat $ =,533.00 320 Jumpseat $ =,425.00 325 Floor Covering (Entryway) $ =,272.00 400 Main Cabin Area Price 401 Headliner Panels $ =,825.00 402 R/H & L/H PSU / Valance Panels $ 13,535.00 406 Window Line Panels $ 13,915.00 409 Lower Sid
From: jeffrey E. <[email protected]> Sent: Monday, May 22, 2017 5:56 PM To: Richard Kahn Subject: Re: seat prices sign contract and begin On Mon, May 22, 20
after initially discounting the=cost per seat from Rev 2 to Rev 3, I have held the cost per seat consisten=- inclusive of all changes. This aside, Jeffrey makes continuous changes, so we are always shoo=ing at a moving target. No. of Seats Price Q Q Per Seat $ 4, Proposal Revision -6- 4> 4e
PM, Eric Roth40 wrote: Oat=: 4.24.17 Cli=nt: JE Air=raft: G550 Ser=al Number: 5173 soft goods
ay, May 22, 2017 11:47 AM To: Eric Roth Subject: seat prices In reviewing last few versions of bid i noticed=that the seat prices keep changing in Main Cabin Area (420)<=p> Original quote had 8 seats in the main cabin ar=a for $116,800 which is $14,600 per seat Latest quote dated 5.19.2017 now has 8 sea
From: Eric Roth Sent: Tuesday, 11.111. To: jeffrey E. Subject: RE: G550 sn 5173 Date: 4.24.17 Client: JE Aircraft: G550 Serial Number: 5173 soft goods 200 Cockpit Area Price 201 Cockpit Headliner
ubject: RE: G550 sn 5173 Date: 4.24.17 Client: JE Aircraft: G550 Serial Number: 5173 soft goods
R/H Fwd Lay Potty Seat $ 2,533.00 320 Jumpseat $ 8,425.00 325 Floor Covering (Entryway) $ 1,272.00 2 EFTA_R1_01387261 EFTA02377052 400 Main Cabin Area Price 401 Headliner Panels $ 9,825.00 402 R/H & L/H PSU / Valance Panels $ 13,535.00 406 Window Line Panels $ 13,915.00 409 Lower Sid
From: Larry Visoski Sent: Saturday, Mai... To: Je vacation Cc: Rich Kahn Subject: Gulfstream SAV interior Budget Jeffrey, I received this quote from Rusty back in April ref interior budget nu=bers with Savanah,. Savanah quoted = 1- $779,803 for full wood veneer chang
April ref interior budget nu=bers with Savanah,. Savanah quoted = 1- $779,803 for full wood veneer chang=., 2- $95k for New Carpet„ 3-$200k for 8 Main Cabin chairs ($25k Each) 4-$70k for 2 divans re-cover ($35k each) <=iv id="AppleMailSignature"> =span style='background-color: rgba(255, 255, 255, 0);">Qu
Entities connected to both Jeffrey Epstein and Main Cabin

Richard Kahn
PERSON
Marc Rich
PERSONLarry Visoski
PERSON
Eric Trump
PERSONEric Roth
PERSON
Ronkonkoma
LOCATIONIslip
LOCATIONAft L/H Galley
ORGANIZATIONJumpseat
LOCATIONPotty Seat & Shroud
ORGANIZATIONLighting System
ORGANIZATIONGalley Area
LOCATIONOptions 1
ORGANIZATIONR/H & L/H PSU / Valance Panels
ORGANIZATIONEntrance Area
LOCATIONCockpit Area
LOCATIONGlareshield
LOCATIONWindow Line
ORGANIZATIONUSB Ports
ORGANIZATIONRev 2 to Rev 3
ORGANIZATION