4
Shared Docs
4
Same-Page
15 / 4
Mentions
From: "Jeffrey E." <[email protected]> To: Daphne Wallace Subje
, ann rodriquez Attached are the revised drawings for the R.O. & Generator Building Roofing project. These changes are based upon comments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: I. The longer building (R.O. Bldg.) will be exp
From: "Jeffrey E." <[email protected]> To: Daphne Wallace S
ject. These changes are based upon comments from Mr. Epstein at a recent site visit on Friday, April 17, 2015.
mments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: I. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exter
aving enough maneuverability to take the dump bins in and out if the building is made wider. Respectfully, Daphne On Wed, Apr 22, 2015 at 2:38 PM, Jeffrey E. <[email protected]> wrote: page 9 elevaion is wrong shoudl extend past teh wall On Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallace < wrote: Greeti
Daphne, >, ann Attached are the revised drawings for the R.O. & Generator Building Roofing project. These changes are based upon comments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be exp
From: "Jeffrey E." <[email protected]> To: Daphne Wallace S
ject. These changes are based upon comments from Mr. Epstein at a recent site visit on Friday, April 17, 2015.
mments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exter
ing's manufacturer. We can design it and show the steel building manufacturer what you want. Respectfully, Daphne On Wed, Apr 22, 2015 at 2:40 PM, jeffrey E. <[email protected]> wrote: on builiding b can we have a flat roof? On Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallace < wrote: Greetings Sir, Rev
Daphne, >, ann Attached are the revised drawings for the R.O. & Generator Building Roofing project. These changes are based upon comments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be exp
From: "Jeffrey E." <[email protected]> To: Daphne Wallace S
ject. These changes are based upon comments from Mr. Epstein at a recent site visit on Friday, April 17, 2015.
mments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exter
From: jeffrey E. <[email protected]> Sent: Wednesday, April 22, 2015 7:39 PM To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions page 9 elevaion
phne, 4> > > Attached are the revised drawings for =he R.O. & Generator Building Roofing project. These changes are based =pon comments from Mr. Epstein at a recent site visit on Friday, April 17, =015. In summary, the changes requested are as follows: 1. * The longer building (R.O. Bldg.) will be e
ject. These changes are based =pon comments from Mr. Epstein at a recent site visit on Friday, April 17, =015.
ents from Mr. Epstein at a recent site visit on Friday, April 17, =015. In summary, the changes requested are as follows: 1. * The longer building (R.O. Bldg.) will be expand=d to a width of 60 feet. There will be roll up doors on both of the short =nds. The two long sides will have no openings. The exter
Entities connected to both Jeffrey Epstein and R.O. Bldg