3
Shared Docs
3
Same-Page
6 / 3
Mentions
From: Brice Gordon To: "jeffrey E." <[email protected]> Subject: Re: ZDC Log Cab
Attachments: ZDC_Log_Cabin_Parkl.JPG; ZDC_Log_Cabin_Park2.JPG Inline-Images: IMG_1033.JPG; IMG_1038.JPG; IMG_1035.JPG; IMG_1032.JPG; IMG_1036.JPG Jeffrey Confirming the direction you gave during your visit was to level the area at the back of the cabin, so guest would be able to turn around safely G
Gordon > wrote: Jeffrey Attached photo of progress at the Log Cabin More rocks and fill have been added and french drain installed for drainage Load Talley as of Date 5 loads of Rocks 7 loads Back fill Anticipate finishing the front grade end of this week, Back parking area and steps etc completion t
From: jeffrey E. <[email protected]> Sent: Monday, September 14, 2015 1:11 AM To: Brice Gordon Subject: Re: ZDC Log Cabin Grade photos? On Sun, Sep 13, 2015
ds of Rocks 7 loads Back fill Anticipate finishing the front grade end of t=is week, regards Brice On Fri, Sep 4, 2015 at 5:40 PM, Zor=o Ranch < Jeffrey <mailto > wrote: Attached photos of progress at the=Log Cabin for your consideration Grading and rock laying will continue next week <=iv class=
rence regards Brice Attached photo of progress at the Log Cabin=/div> More rocks and fill have=been added and french drain installed for drainage Load Talley as of Date S loads of Rocks 7 loads Back fill Anticipate finishing the front grade end of t=is week, regards Brice On Fri, Sep 4, 2015 at 5:40 P
From: jeffrey E. <[email protected]> Sent: Monday, September 14, 2015 1:15 AM To: Brice Gordon Subject: Re: ZDC Log Cabin Grade just saw attachments. lets se
w attachments. lets seed , so it looks =rassy instead of beachy, thanks it will look good<=r> On Sun, =ep 13, 2015 at 7:58 PM, Brice Gordon =rote: Jeffrey Confirming the direction you gave during your visit wa= to level the area at the back of the cabin, so guest would be able to tur= around safely W
ce Gordon wrote: Jeffrey Attached photo of progress at the Log Cabin More rocks and fill have been added and french dra=n installed for drainage Load Talley as of Date 5 loads of Rocks 7 loads Back fill =nticipate finishing the front grade end of this week, Back parking area and steps a=c completion t
Entities connected to both Jeffrey Epstein and Load Talley