From: Brice Gordon To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn Zorro Ranch .c: > Subject: ZDC-HWS-Leak Date: Sat, 04 Oct 2014 18:53:50 +0000 Attachments: HWS_Leak.MOV;
.c: > Subject: ZDC-HWS-Leak Date: Sat, 04 Oct 2014 18:53:50 +0000 Attachments: HWS_Leak.MOV; ZDC-HWS_Leak.JPG; ZDC-HWS_Pipe.JPG; HWS-Repaired.jpg Jeffrey attached for your reference I. Video showing leaking Supply Line to Garage Heaters from Main Hot Water Supply (HWS) 2. Hole in Supply Line 3. Sup
From: Brice Gordon To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn Zorro Ra
zed pipe. Also the section of pipe that had the hole in it, was not insulated correctly and the back fill around the pipe was full of large rocks. Horizon Mechanical have replaced all HWS lines and CWS stub outs today. HWS and CWS have been turned back on to test both lines for leaks. If no other leaks are found
From: "Jeffrey E." <[email protected]> To: Richard Kahn Subject
From: "Jeffrey E." <[email protected]> To: Richard Kahn Sub
nch < Rich Attached Monitoring Contract for HVAC system at Zorro As discussed ECI's Contract for monitoring HVAC was not renewed and I approached Horizon Mechanical to provide a new contract. I would like to proceed with Horizon, starting October 1st 2015, on a monthly basis, at a cost of $427.50. ECI cost was $
5, 2017, at 11:21 AM, ZM < > wrote: Thank you Will keep you updated on progress Regards Brice Sent from my iPhone On Aug 5, 2017, at 10:38 AM, jeffrey E. <[email protected]> wrote: of course . On Sat, Aug 5, 2017 at 10:18 AM, Brice Gordon <I l> wrote: Jeffrey I am having an issue with the revers
From: ZM To: "Jeffrey E." <[email protected]> Cc: ZDC Subject: Re: ZM HP7B Master Bedroom Date: Mon, 07 Aug 2017 19:33:57 +0000 Jeffery Master bedroom unit reversing valve has been changed and unit is fully operational and maintaining room temperature Regards Brice Sent from my iP
note these units run 24/7 to maintain temperature and humidity levels in Library and Living room. The cost for these repairs, $5500.00 each Lastly, Horizon Mechanical ceased providing service to the Ranch in April 2017, I have reached out to numerous companies asking if they would be interested in providing a PMA
From: Brice Gordon To: J Epstein <[email protected]> Cc: Rich Kahn < >, Zorro Ranch Subject: Re: ZDC MH Water Line Leak Date: Tue, 08 Mar 2016 02:14:45 +0000 Attachments: MH_
Cc: Rich Kahn < >, Zorro Ranch Subject: Re: ZDC MH Water Line Leak Date: Tue, 08 Mar 2016 02:14:45 +0000 Attachments: MH_Leak.JPG; MH_LeakI.JPG Jeffrey attached photos for your reference after exposing 6 pipes, it was determined the leak was from a damaged copper irrigation line. The line was isol
fter exposing 6 pipes, it was determined the leak was from a damaged copper irrigation line. The line was isolated and will be repaired Wednesday by Horizon Mechanical As of tonight the main house is back online. regards Brice On Mon, Mar 7, 2016 at 7:02 AM, Zorro Ranch < > wrote: Jeffrey Attached photo for yo
From: To: "Jeffrey E." <[email protected]> Cc: Rich Kahn Subject:
From: To: "Jeffrey E." <[email protected]> Cc: Rich Kahn Subject: ZM HP7B Master Bedroom Date: Sat, 05 Aug 2017 14:18:20 +0000 Jeffrey I am having an issue with the reversing value on the Master Bedroom Unit. I noticed on Wednesday night the room was not maintaining Temperature of
note these units run 24/7 to maintain temperature and humidity levels in Library and Living room. The cost for these repairs, $5500.00 each Lastly, Horizon Mechanical ceased providing service to the Ranch in April 2017, I have reached out to numerous companies asking if they would be interested in providing a PMA
From: Richard Kahn < Sent: Tuesday, September 8, 2015 9:44 PM To: jeffrey E. Subject: Fwd: ZDC HVAC Monitoring Contract Attachments: HVAC I Net 7 Monitoring.pdf; Untitled attachment 00008.htm Brice would like to switch HVAC
nch < Rich Attached Monitoring Contract for HVAC system =t Zorro As =iscussed SCI's Contract for monitoring HVAC was not =enewed and I approached Horizon Mechanical to provide a new =ontract. I =ould like to proceed with Horizon, starting October 1st 2015, on a =onthly basis, at a cost of $427.50. ECI cost was
Entities connected to both Jeffrey Epstein and Horizon Mechanical

Richard Kahn
PERSON
Marc Rich
PERSON
Condoleezza Rice
PERSON
Jes Staley
PERSONBrice Gordon
PERSON
Zorro
LOCATIONRanch
ORGANIZATION
Honeywell
ORGANIZATION
Horizon
ORGANIZATIONTrane
ORGANIZATIONManufacture
ORGANIZATIONRosemont
LOCATIONthe Master Bedroom Unit
ORGANIZATION