6
Shared Docs
6
Same-Page
15 / 6
Mentions
when it will be replaced. 2 EFTA00577584 PALM BEACH STATUS ITEM COMMENT + Update + JE Plse advise 1. Landscape Lighting i) Complete. Is JE happy with it? + Update 2. Furniture for Paula Epstein ii) Triconfort furniture will be delivered April 17. + Update 3. Triconfort Cushions
Smelling Plants xxviii) Flowers. Gardenias are growing. Jasmines will be planted after the gym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly Pavement Dust Prevention xxx) Process on hold whilst gym is being erected. Miles continues to spra
ym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly P
andscaping is subject to JE approval. + Update 19. Tiles for Beach Hut xxiii) Will be installed by April 25th. + Update + Update > Update 20. Seamore, Nanna, Fat Cat & Lady G2 xxiv) Nanna - Is operational. Fat Cat — Strengthening of bulkhead and interior is currently being worked on. Yamaha are
when it will be replaced. 2 EFTA00577634 PALM BEACH STATUS ITEM COMMENT + Update + JE Plse advise 1. Landscape Lighting i) Complete. Is JE happy with it? + Update 2. Furniture for Paula Epstein ii) Triconfort furniture will be delivered April 17. + Update 3. Triconfort Cushions
Smelling Plants xxviii) Flowers. Gardenias are growing. Jasmines will be planted after the gym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly Pavement Dust Prevention xxx) Process on hold whilst gym is being erected. Miles continues to spra
ym is completed. + NC 26. Wind Generator xxix) Mr. Epstein has placed positioning on hold. + NC 27. Poly P
. Landscaping is subject to JE approval. + Update 19. Tiles for Beach Hut xxiii) Will be installed by April 25th. + Update + Update f•Itc, 20. Seamore, Nanna, Fat Cat & Lady G2 xxiv) Nanna - Is operational. Fat Cat — Strengthening of bulkhead and interior is currently being worked on. Yamaha are
ters vii) 13/12 — Valdson installed second card reader on GM computer and is now working. + Update 8. Photos for Apt viii) 13/12 - Nine 8% x 13 JE brain picture for dining room to replace African heads — Valdson has pictures and will 1 EFTA00577661 FORTNIGHTLY REPORT FRIDAY 13 DECEMBER ST
rm in writing the condominium's consent to the proposed windows change; the letter, to be signed by Serge Boquet on behalf of SCIJEP, the owner of Jeffrey's apartments, simply requests the necessary consent from the building manager. Darren approved the form of the letter and sent it back to Serge Boq
al. These have been planted and area made good. Trees removed to be planted around engineering — in progress. + NC 42. Wind Generator lvii) Mr Epstein has placed positioning on hold. + NC 43. Floating Dock lviii) Floats and hardware on island. Fabrication to commence once new dock complete — o
w view xlix) 13/12 — These have been installed and completed. + Update 36. MBR Shelving I) 13/12 - Complete + Update 37. Replace motors in Seamore and Nanna li) JE authorized the installation of a new motor in Seamore Seamore motor is still under discussion between various parties to deter
installation 15 April. FYI: Installation of the diffusers expected to take two weeks, the room will have to be repainted and require scaffolding, JE to advise once the diffusers are on sight, most appropriate two week for week to be complete. + Update 2. Oxygen supply iii) Oxygen tank had to
quired. Suggested attendees: Miles, Boscoe, Bruce, Kurt and Trevor. Kathy suggested 18 April, please advise. + NC 27. Wind Generator xxxii. Mr. Epstein has placed positioning on hold. + NC 28. Poly Pavement Dust Prevention xxxiii. Process on hold whilst gym is being erected. Miles continues to
please advise. + NC 27. Wind Generator xxxii. Mr. Epstein has placed positioning on hold. + NC 28. Poly P
. Linda Pinto confirmed they ordered the incorrect tiles. New tiles are now on order and expected first week of March. 28. Update 28. Update 20. Seamore, Nanna, Fat Cat & Lady G2 xxiv. Nanna - Is operational. Some cosmetic work remains but should be completed today. Fat Cat — is in St Thomas. Bos
WEEKLY REPORT FRIDAY SEPTEMBER 6, 2002 ACTION POINTS REOUIRING JE's COMMENT 71ST STREET i) JE to still use the Thalgo massage table heating blanket before advising if we are to purchase for any other property. ZORRO ii) is aware that the t
is is scheduled for next week. Due to the pending visit, I can put this project on hold. Please advise? vii) Hot Tub — This has been installed. Mr Epstein requested that the temp be increased. The programming pumps and solenoids are designed for the current temp. The temp is set at this maximum level
put forward a proposal for JE to review. Ongoing 1. Repair the work done on beach two. 2. Continue stoning roads. 3. Complete installing wipers on Seamore. 4. Install weights on New Holland tractor. 5. Repair master bedroom rain gutters PALM BEACH 1. Small gun safe with a digital pad for the rema
PORT — November 28, 2003 LSJ LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE DOCK Floating Platform and Dock Additional 2 steps per JE design have been added. Complete GYM Cement outside Tile to be installed outside gym to increase cement. JE to supply drawing of area in order t
RESS REPORT — November 28, 2003 LSJ LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE SEAMORE Listing Seamore for sale at $250,000.00. Seamore has been listed in St. Thomas Yacht Sales books. No interest shown in boat to date. Boscoe Complete CALYPSO Calypso Boat JE advised to re-cover
Entities connected to both Jeffrey Epstein and Seamore

Marc Rich
PERSONDarren Indyke
PERSONLarry Visoski
PERSON
Ghislaine Maxwell
PERSON
Alan Dershowitz
PERSON
Madison
LOCATION
George W. Bush
PERSON
Prince Charles
PERSON
FedEx
ORGANIZATION
Teterboro
LOCATION
St Thomas
LOCATION
Samantha Power
PERSON
Puerto Rico
LOCATION
Zorro
LOCATION
Oliver Stone
PERSON
Les Wexner
PERSON
Ralph Lauren
PERSONLinda Pinto
PERSONNicholas
PERSON
St. John
LOCATION