9
Shared Docs
9
Same-Page
13 / 9
Mentions
installation 15 April. FYI: Installation of the diffusers expected to take two weeks, the room will have to be repainted and require scaffolding, JE to advise once the diffusers are on sight, most appropriate two week for week to be complete. + Update 2. Oxygen supply iii) Oxygen tank had to
quired. Suggested attendees: Miles, Boscoe, Bruce, Kurt and Trevor. Kathy suggested 18 April, please advise. + NC 27. Wind Generator xxxii. Mr. Epstein has placed positioning on hold. + NC 28. Poly Pavement Dust Prevention xxxiii. Process on hold whilst gym is being erected. Miles continues to
please advise. + NC 27. Wind Generator xxxii. Mr. Epstein has placed positioning on hold. + NC 28. Poly P
his project. 28. Update 22. MBR Curtain Rod xxvi. Expected delivery 4 April. Update 23. Grotto xxvii. Architects have not provided updates to Madison Cox per last correspondence Miles received from Cox. C Miller is working to get architects to respond. NC 24. Great Room wind Protection Panels xxv
WEEKLY REPORT FRIDAY SEPTEMBER 6, 2002 ACTION POINTS REOUIRING JE's COMMENT 71ST STREET i) JE to still use the Thalgo massage table heating blanket before advising if we are to purchase for any other property. ZORRO ii) is aware that the t
is is scheduled for next week. Due to the pending visit, I can put this project on hold. Please advise? vii) Hot Tub — This has been installed. Mr Epstein requested that the temp be increased. The programming pumps and solenoids are designed for the current temp. The temp is set at this maximum level
eement with Madison Cox Design Inc. who will be doing the landscape design services. NS has sent a copy to Charles Miller and a signed copy back to Madison Cox and has requested Eric pay the $40k deposit. Household Same 1. Erect eight bamboo flagpoles — the design from Ed Tuttle has been refaxed to Mile
From: "Jeffrey E." <[email protected]> To: Karyna Shuliak Subj
From: "Jeffrey E." <[email protected]> To: Karyna Shuliak
e: Date: Wed, 21 Mar 2018 09:58:12 +0000 i met with him On Tue, Mar 20, 2018 at 11:24 PM, Karyna Shuliak < > wrote: Would it be possible to hire Madison Cox to do the landscaping for the island? On Mar 20, 2018, at 11:21 PM, Karyna Shuliak < wrote: https://habituallychicluxury/2014/07/conde-nast-living
PORT — November 28, 2003 LSJ LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE DOCK Floating Platform and Dock Additional 2 steps per JE design have been added. Complete GYM Cement outside Tile to be installed outside gym to increase cement. JE to supply drawing of area in order t
area of color. (Miles sd that he was not sure now whether he should buy the trees as apparently JE sd that the whole area needs to be designed by Madison Cox to achieve a structured terrace look). The area is also possible site for orchard. Per JE, on hold. Matt Mahaffey On hold Fniit Tree Orchard Ma
NEXT ACTION BY DATE BY REVISED DATE Boulder Lights 1. RMC (installation co) quotes: $12, 827.62 for wiring or $22,822.28 for wiring & lights. JE approved these lights however, waiting to see if Cox's lights are better. 2. Lights recommended by Madison on site. Unable to wire-up due to their
to be scheduled to make site visit for second opinion / proposal. Fountain in Estancia 1. Daniel R to design & forward to Pinto for approval. 2. Madison Cox submitted drawings. Plans sent in Sept 19 report. Daniel R I EFTA00577545 ESTATE PROGRESS REPORT - SEPTEMBER 26.2003 LOCATION COMMENT NEXT A
From: Karyna Shuliak To: Jeffrey <[email protected]> Subject: Re: Date: Wed, 21 Mar 2018 03:24:00 +0000 Would it be possible to hire Madison Cox to do the landscaping for the
From: Karyna Shuliak To: Jeffrey <[email protected]> Subject: Re: Date: Wed, 21 Mar 2018 03:24:00 +0000 Would it be possible to hire Madison Cox to do the landscaping for the island? On Mar 20, 2018, at 11:21 PM, Karyna Shuliak > wrote: https://habituallychic.luxury/2014/07/conde-nast-livin
NEXT ACTION BY DATE BY REVISED DATE Boulder Lights 1. RMC (installation co) quotes: $12, 827.62 for wiring or $22,822.28 for wiring & lights. JE approved these lights however, waiting to see if Cox's lights are better. 2. Lights recommended by Madison on site. Unable to wire-up due to their
to be scheduled to make site visit for second opinion / proposal. Fountain in Estancia 1. Daniel R to design & forward to Pinto for approval. 2. Madison Cox submitted drawings. Plans sent in Sept 19 report. Daniel R i EFTA00578143 ESTATE PROGRESS REPORT - SEPTEMBER 26.2003 LOCATION COMMENT NEXT A
From: jeffrey E. <[email protected]> Sent: Wednesday, March 21, 2018 9:58 AM To: Karyna Shuliak Subject: Re: i met with him On Tue, Mar 20, 2018 at 11:24 PM
iak Subject: Re: i met with him On Tue, Mar 20, 2018 at 11:24 PM, Karyna Shuliak <=pan dir="Itr' <mailto > wrote: Would it be possible to hire Madison Cox to do the landscaping for the =sland? On Mar 20, 2018, at 11:2= PM, Karyna Shulia <mailto > wrote: https://habituallychic.lux=ry/2014/07/conde-na
From: Karyna Shuliak Sent: Wednesday, March 21, 2018 3:24 AM To: Jeffrey Subject: Re: Would it be possible to hire Madison Cox to do the landscaping for the island? On Mar 20, 2018, at 11:21 PM, Karyna Shuliak > wrote
From: Karyna Shuliak Sent: Wednesday, March 21, 2018 3:24 AM To: Jeffrey Subject: Re: Would it be possible to hire Madison Cox to do the landscaping for the island? On Mar 20, 2018, at 11:21 PM, Karyna Shuliak > wrote: https://habituallychic.luxury/2014/07/conde-nast-livin
Entities connected to both Jeffrey Epstein and Madison Cox

Marc Rich
PERSON
Karyna Shuliak
PERSONDarren Indyke
PERSON
Ghislaine Maxwell
PERSON
Madison
LOCATION
Condoleezza Rice
PERSON
St Thomas
LOCATION
Samantha Power
PERSON
Puerto Rico
LOCATION
Oliver Stone
PERSONPinto
PERSONNanna
PERSONMiles
PERSONBoscoe
ORGANIZATIONMain House
ORGANIZATIONSawyers
ORGANIZATIONEstancia
LOCATIONDakota
ORGANIZATIONJE sd
ORGANIZATIONSeamore
PERSON