3
Shared Docs
3
Same-Page
3 / 3
Mentions
w that we are minimizing impacts to the greatest extent possible while making the dock practical and safe for use to service the existing compound. Electrical Cable from Great Bay I have just finished permitting and installing the viNGN cable in Great Bay that goes to St. Croix. When I developed that route, I p
n be forwarded to the Governor for signature who then sends the permit to the legislature for approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernat
if not, it would be a good solution. There may also be another site in the north facing bay which might be suitable. I would like to look at both. Electrical Cable from GSJ I know we can find a workable mute from GSJ. I want to bring the cable over to the east side of GSJ and cut across heading a little north
n be forwarded to the Governor for signature who then sends the permit to the legislature for approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernat
t all one time they will probable roll the dock extension into the new permit as well when they permit move the existing dock into the new permit. Electrical Cable from Great Bay I have just finished permitting and installing the viNGN cable in Great Bay that goes to St. Croix. When I developed that route, I p
n be forwarded to the Governor for signature who then sends the permit to the legislature for approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernat
Entities connected to both Electrical Cable and the Committee on Environmental Protection
Vernill Roberts
PERSON
Sarah Ferguson
PERSONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONMycetophylla
PERSONWaste Water Treatment Plant(WWTP
ORGANIZATIONThe Environmental Assessment Report
ORGANIZATIONthe Body of the Whole
ORGANIZATIONUtilities
ORGANIZATION
San Juan
LOCATIONErika Kellerhals
PERSONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATION