3
Shared Docs
3
Same-Page
3 / 3
Mentions
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernatorial and legislative approval is dependent on lobbying. The USACOE appli
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernatorial and legislative approval is dependent on lobbying. The USACOE appli
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernatorial and legislative approval is dependent on lobbying. The USACOE appli
Entities connected to both Cable Lay Monitoring and the Body of the Whole
Description of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONMycetophylla
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONThe Lump Sum Cost of
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONErika Kellerhals
PERSONPublic Hearings
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATION