4
Shared Docs
4
Same-Page
4 / 4
Mentions
e re- formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 37,500.00. Cost for work
for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A cervicornis,Orbirella spp. Dcndrogyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in fo
e re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These V1411 be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 47,500.00. Cost for work
es for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A arvicomis, &biretta spp.Demirogyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in f
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 67,500.00. Cost for work
cies for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A cm/Longs, Wireila spp.Demiragyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in f
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 82,500.00. Cost for work
s for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A cervicornis,Orbicella spp.Dendrogyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in f
Entities connected to both The Lump Sum Cost of and Mycetophylla
Cable Lay Monitoring
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION