e re- formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 37,500.00. Cost for work
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
e re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These V1411 be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 47,500.00. Cost for work
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 67,500.00. Cost for work
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 82,500.00. Cost for work
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
Entities connected to both The Lump Sum Cost of and Cable Lay Monitoring
Mycetophylla
PERSONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION