3
Shared Docs
3
Same-Page
3 / 3
Mentions
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
. This unfortunately can take a while; by regulation they have 180 days to evaluate the permit. We should be able to this much quicker if we push on Vernill Roberts who is in charge of TPDES permits. Also if we are thinking of putting in a small Waste Water Treatment Plant(WWTP) we will need to include the WWT
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
This unfortunately can take a while; by regulation they have 180 days to evaluate the permit. We should be able to this much quicker if we push on Vernill Roberts who is in charge of TPDES permits. Also if we are thinking of putting in a small Waste Water Treatment Plant(WWTP) we will need to include the WWTP
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
. This unfortunately can take a while; by regulation they have 180 days to evaluate the permit. We should be able to this much quicker if we push on Vernill Roberts who is in charge of TPDES permits. Also if we are thinking of putting in a small Waste Water Treatment Plant(WWTP) we will need to include the WWT
Entities connected to both Public Hearings and Vernill Roberts
Ferguson Kroblin
PERSON
Sarah Ferguson
PERSONErika Kellerhals
PERSONBioimpact, Inc.
ORGANIZATIONAmy Claire Dempsey
PERSONMycetophylla
PERSONWaste Water Treatment Plant(WWTP
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATION
Coastal
LOCATION