4
Shared Docs
4
Same-Page
4 / 4
Mentions
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A cervicornis,Orbirella spp. Dcndrogyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in fo
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
es for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A arvicomis, &biretta spp.Demirogyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in f
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
cies for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A cm/Longs, Wireila spp.Demiragyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in f
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
s for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A cervicornis,Orbicella spp.Dendrogyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in f
Entities connected to both Public Hearings and Mycetophylla
Cable Lay Monitoring
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION