4
Shared Docs
4
Same-Page
4 / 4
Mentions
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
Entities connected to both Public Hearings and Cable Lay Monitoring
Mycetophylla
PERSONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION