hat impact the vessels might have during construction. The survey will need to completely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be poten
e re- formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 37,500.00. Cost for work
construction. The survey will need to completely map the benthic resources BIOIMPACT, INC. Page 4 EFTA00583582 within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NN1FS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be pote
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 67,500.00. Cost for work
at impact the vessels might have during construction. The survey will need to completely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potent
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 82,500.00. Cost for work
Entities connected to both Essential Fish Habitat and The Lump Sum Cost of
the Water Quality Monitoring Plan
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATIONU.S. Army Corps
ORGANIZATIONFederal Fish and Wildlife Service
ORGANIZATIONthe Water Quality Certificate
ORGANIZATIONArcheological
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONMycetophylla
PERSON
Sarah Ferguson
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONErika Kellerhals
PERSON