hat impact the vessels might have during construction. The survey will need to completely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be poten
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the route can be laid out to avoid endangered species this may not be necessary. All information should be contained
construction. The survey will need to completely map the benthic resources BIOIMPACT, INC. Page 4 EFTA00583582 within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NN1FS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be pote
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
at impact the vessels might have during construction. The survey will need to completely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potent
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
Entities connected to both Essential Fish Habitat and Formal Section 7 Consultation
the Water Quality Monitoring Plan
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATIONU.S. Army Corps
ORGANIZATIONFederal Fish and Wildlife Service
ORGANIZATIONthe Water Quality Certificate
ORGANIZATIONArcheological
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONMycetophylla
PERSON
Sarah Ferguson
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONErika Kellerhals
PERSON