3
Shared Docs
3
Same-Page
3 / 3
Mentions
hat impact the vessels might have during construction. The survey will need to completely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be poten
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
construction. The survey will need to completely map the benthic resources BIOIMPACT, INC. Page 4 EFTA00583582 within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NN1FS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be pote
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
at impact the vessels might have during construction. The survey will need to completely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potent
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
Entities connected to both Essential Fish Habitat and Public Hearings
the Water Quality Monitoring Plan
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATIONU.S. Army Corps
ORGANIZATIONFederal Fish and Wildlife Service
ORGANIZATIONthe Water Quality Certificate
ORGANIZATIONArcheological
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONInteragency Meeting
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONMycetophylla
PERSON
Sarah Ferguson
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONErika Kellerhals
PERSON