ill they be maintained. 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
and cable route selection will be critical in determining permit times and permits required. We know that the dock extension will impact seagrass. The Environmental Assessment Report will act as the main reference document for the Coastal Zone Management Permit application, the U.S. ACOE permit application, and the Water Quality
will they be maintained 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
w that a dock extension will impact seagrass. I will try to find the permit dock location which has minimal impact and will not require mitigation. The Environmental Assessment Report will act as the main reference document for the Coastal Zone Management Permit application, the U.S. ACOE permit application, and the Water Quality
will they be maintained 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
tated before the cable landing site, cable route selection and new dock location will be critical in determining permit times and permits required. The Environmental Assessment Report will act as the main reference document for the Coastal Zone Management Permit application, the U.S. ACOE permit application, and the Water Quality
Entities connected to both USACOE and The Environmental Assessment Report
Description of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONMycetophylla
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONCable Lay Monitoring
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONErika Kellerhals
PERSONFormal Section 7 Consultation
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATION