ill they be maintained. 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
e re- formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 37,500.00. Cost for work
ill they be maintained. 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
e re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These V1411 be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 47,500.00. Cost for work
will they be maintained 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 67,500.00. Cost for work
will they be maintained 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 82,500.00. Cost for work
Entities connected to both USACOE and The Lump Sum Cost of
Mycetophylla
PERSONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION