Construction Activities & Implementation of Sediment Control
ORGANIZATIONthe Committee on Environmental Protection
ORGANIZATION3
Shared Docs
3
Same-Page
3 / 3
Mentions
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
n be forwarded to the Governor for signature who then sends the permit to the legislature for approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernat
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
n be forwarded to the Governor for signature who then sends the permit to the legislature for approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernat
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011 Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
n be forwarded to the Governor for signature who then sends the permit to the legislature for approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernat
Entities connected to both Construction Activities & Implementation of Sediment Control and the Committee on Environmental Protection
Description of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONMycetophylla
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONCable Lay Monitoring
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONErika Kellerhals
PERSONFormal Section 7 Consultation
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATION