Location of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATION4
Shared Docs
4
Same-Page
4 / 4
Mentions
ary of construction activities again in detail. 5.01a Purpose of Project: What the proposal hopes to accomplish (much like 4.0). 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the route can be laid out to avoid endangered species this may not be necessary. All information should be contained
ary of construction activities again in detail. 5.Ola Purpose of Project: What the proposal hopes to accomplish (much like 4.0). 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
detail. 5.01a Purpose of Project: What the proposal hopes to accomplish (much like 4.0). BI0IMPACT, INC. Page 3 EFTA00583581 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
ary of construction activities again in detail. 5.01a Purpose of Project: What the proposal hopes to accomplish (much like 4.0). 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
Entities connected to both Location of Any Critical Areas or Possible Trouble Spots and Formal Section 7 Consultation
Mycetophylla
PERSONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION