If we need an archeological study I can get proposals for you. If we have to do a study, once its complete we will request a clearance letter from the DPNR State Historic Preservation Officer (SHPO). As stated before the cable landing site, and cable route selection will be critical in determining permit times and permits required. I wil
e re- formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 37,500.00. Cost for work
If we need an archeological study I can get proposals for you. If we have to do a study, once its complete we will request a clearance letter from the DPNR State Historic Preservation Officer (SHPO). As stated before the cable landing site, and cable route selection will be critical in determining permit times and permits required. We kn
e re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These V1411 be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 47,500.00. Cost for work
If we need an archeological study I can get proposals for you. If we have to do a study, once its complete we will request a clearance letter from the DPNR State Historic Preservation Officer (SHPO). As stated before the cable landing site, and cable route selection will be critical in determining permit times and permits required. We kn
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 67,500.00. Cost for work
If we need an archeological study I can get proposals for you. If we have to do a study, once its complete we will request a clearance letter from the DPNR State Historic Preservation Officer (SHPO). As stated before the cable landing site, cable route selection and new dock location will be critical in determining permit times and permi
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 82,500.00. Cost for work
Entities connected to both the DPNR State Historic Preservation Officer and The Lump Sum Cost of
Mycetophylla
PERSONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION