cable the best as possible to avoid this. Archeological surveys will probably not be required for the cable lay. I will verify with David Brewer of VISHPO if one will be required and if not I will get a letter from him saying so. If we need an archeological study I can get proposals for you. If we have
e re- formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 37,500.00. Cost for work
sible to avoid this. Archeological surveys will probably not be required for the extension of the dock and the cable lay. I can ask David Brewer of VISHPO if one will be required and if not I will get a letter from him saying so.. If we need an archeological study I can get proposals for you. If we hav
e re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These V1411 be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 47,500.00. Cost for work
logical surveys will probably not be required for the extension of the dock if we decided to go that way or the cable lay. I can ask David Brewer of VISHPO if one will be required and if not I will get a letter from him saying so. We probably will need one for a new dock site. If we need an archeologica
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 67,500.00. Cost for work
Entities connected to both VISHPO and The Lump Sum Cost of
the Water Quality Monitoring Plan
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATIONU.S. Army Corps
ORGANIZATIONFederal Fish and Wildlife Service
ORGANIZATIONthe Water Quality Certificate
ORGANIZATIONArcheological
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONMycetophylla
PERSON
Sarah Ferguson
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONErika Kellerhals
PERSON