e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock and the cable lay. I can ask David Brewer of VISHPO if one will be required and
approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernatorial and legislative approval is dependent on lobbying. The USACOE appli
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock if we decided to go that way or the cable lay. I can ask David Brewer of VISHPO
approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernatorial and legislative approval is dependent on lobbying. The USACOE appli
ruction procedures. If either NMFS or FWS determine that the project may impact endangered species Formal Section 7 consultation will be required. Archeological surveys may be required for the extension of the dock and the new dock structure, the cable should not require an archeological study since it will
approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernatorial and legislative approval is dependent on lobbying. The USACOE appli
Entities connected to both Archeological and the Body of the Whole
Location of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONMycetophylla
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONCable Lay Monitoring
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONErika Kellerhals
PERSONFormal Section 7 Consultation
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATION