e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the cable lay. I will verify with David Brewer of VISHPO if one will be required and if not I will get a l
ary of construction activities again in detail. 5.01a Purpose of Project: What the proposal hopes to accomplish (much like 4.0). 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock and the cable lay. I can ask David Brewer of VISHPO if one will be required and
ary of construction activities again in detail. 5.Ola Purpose of Project: What the proposal hopes to accomplish (much like 4.0). 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock if we decided to go that way or the cable lay. I can ask David Brewer of VISHPO
detail. 5.01a Purpose of Project: What the proposal hopes to accomplish (much like 4.0). BI0IMPACT, INC. Page 3 EFTA00583581 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
ruction procedures. If either NMFS or FWS determine that the project may impact endangered species Formal Section 7 consultation will be required. Archeological surveys may be required for the extension of the dock and the new dock structure, the cable should not require an archeological study since it will
ary of construction activities again in detail. 5.01a Purpose of Project: What the proposal hopes to accomplish (much like 4.0). 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
Entities connected to both Archeological and Location of Any Critical Areas or Possible Trouble Spots
the DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION