4
Shared Docs
4
Same-Page
4 / 4
Mentions
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the cable lay. I will verify with David Brewer of VISHPO if one will be required and if not I will get a l
e the objectives of the overall application. We will need to be provided information from the applicant on what the purpose of the application. 5.0 Description of Project: Detailed description of the project and how the proposal will be implement and how it will be used. 5.01 Summary of Proposed Activity: Summary of
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock and the cable lay. I can ask David Brewer of VISHPO if one will be required and
e the objectives of the overall application. We will need to be provided information from the applicant on what the purpose of the application. 5.0 Description of Project: Detailed description of the project and how the proposal will be implement and how it will be used. 5.01 Summary of Proposed Activity: Summary of
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock if we decided to go that way or the cable lay. I can ask David Brewer of VISHPO
e the objectives of the overall application. We will need to be provided information from the applicant on what the purpose of the application. 5.0 Description of Project: Detailed description of the project and how the proposal will be implement and how it will be used. 5.01 Summary of Proposed Activity: Summary of
ruction procedures. If either NMFS or FWS determine that the project may impact endangered species Formal Section 7 consultation will be required. Archeological surveys may be required for the extension of the dock and the new dock structure, the cable should not require an archeological study since it will
ion. We will need to be provided information from the applicant on what the purpose of the application. BI0IMPACT, INC. Page 3 EFTA00584000 5.0 Description of Project: Detailed description of the project and how the proposal will be implement and how it will be used. 5.01 Summary of Proposed Activity: Summary of
Entities connected to both Archeological and Description of Project
the DPNR State Historic Preservation Officer
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION