Assessment Report will act as the main reference document for the Coastal Zone Management Permit application, the U.S. ACOE permit application, and the Water Quality Certificate and for any other approvals which may be required. Because the federal agencies require more detailed and in depth studies than CZM these will be i
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the route can be laid out to avoid endangered species this may not be necessary. All information should be contained
Assessment Report will act as the main reference document for the Coastal Zone Management Permit application, the U.S. ACOE permit application, and the Water Quality Certificate and for any other approvals which may be required. Because the federal agencies require more detailed and in depth studies than CZM these will be i
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
Assessment Report will act as the main reference document for the Coastal Zone Management Permit application, the U.S. ACOE permit application, and the Water Quality Certificate and for any other approvals which may be required. Because the federal agencies require more detailed and in depth studies than CZM these will be i
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
Assessment Report will act as the main reference document for the Coastal Zone Management Permit application, the U.S. ACOE permit application, and the Water Quality Certificate and for any other approvals which may be required. Because the federal agencies require more detailed and in depth studies than CZM these will be i
etings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if the dock site and route can be laid out to avoid endangered species this may not be necessary. All information shoul
Entities connected to both the Water Quality Certificate and Formal Section 7 Consultation
the DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION