y well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
e able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
o engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011 Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
Entities connected to both U.S. Army Corps and Construction Activities & Implementation of Sediment Control
the DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION