e do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
e re- formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 37,500.00. Cost for work
7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
e re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These V1411 be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 47,500.00. Cost for work
We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 67,500.00. Cost for work
e to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 82,500.00. Cost for work
Entities connected to both Major Coastal Zone Management and The Lump Sum Cost of
the DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION