4
Shared Docs
4
Same-Page
4 / 4
Mentions
e do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
ill they be maintained. 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
ill they be maintained. 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
will they be maintained 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
e to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
will they be maintained 5.02 Exhibits and Drawings: This project will require full sized drawings as well as drawing at an 8.5 x 11 format for the USACOE application. The USACOE drawings will need to include both profile drawing as well as site plan drawings. These drawings will need to be provided by
Entities connected to both Major Coastal Zone Management and USACOE
the DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION