Major Coastal Zone Management
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATION4
Shared Docs
4
Same-Page
4 / 4
Mentions
e do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
ary of construction activities again in detail. 5.01a Purpose of Project: What the proposal hopes to accomplish (much like 4.0). 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
ary of construction activities again in detail. 5.Ola Purpose of Project: What the proposal hopes to accomplish (much like 4.0). 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
detail. 5.01a Purpose of Project: What the proposal hopes to accomplish (much like 4.0). BI0IMPACT, INC. Page 3 EFTA00583581 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
e to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
ary of construction activities again in detail. 5.01a Purpose of Project: What the proposal hopes to accomplish (much like 4.0). 5.01b Presence and Location of Any Critical Areas or Possible Trouble Spots: This section describes the potential environmental problems and issues which will arise in acsnriation with the project. We will address the feder
Entities connected to both Major Coastal Zone Management and Location of Any Critical Areas or Possible Trouble Spots
the DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION