4
Shared Docs
4
Same-Page
4 / 4
Mentions
e do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
e the objectives of the overall application. We will need to be provided information from the applicant on what the purpose of the application. 5.0 Description of Project: Detailed description of the project and how the proposal will be implement and how it will be used. 5.01 Summary of Proposed Activity: Summary of
7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
e the objectives of the overall application. We will need to be provided information from the applicant on what the purpose of the application. 5.0 Description of Project: Detailed description of the project and how the proposal will be implement and how it will be used. 5.01 Summary of Proposed Activity: Summary of
We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
e the objectives of the overall application. We will need to be provided information from the applicant on what the purpose of the application. 5.0 Description of Project: Detailed description of the project and how the proposal will be implement and how it will be used. 5.01 Summary of Proposed Activity: Summary of
e to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
ion. We will need to be provided information from the applicant on what the purpose of the application. BI0IMPACT, INC. Page 3 EFTA00584000 5.0 Description of Project: Detailed description of the project and how the proposal will be implement and how it will be used. 5.01 Summary of Proposed Activity: Summary of
Entities connected to both Major Coastal Zone Management and Description of Project
the DPNR State Historic Preservation Officer
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION