4
Shared Docs
4
Same-Page
4 / 4
Mentions
ne mammal guidelines will be required by the permitting agencies for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A cervicornis,Orbirella spp. Dcndrogyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
ne mammal guidelines will be required by the permitting agencies for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A arvicomis, &biretta spp.Demirogyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to a
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
ne mammal guidelines will be required by the permitting agencies for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A cm/Longs, Wireila spp.Demiragyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to avo
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
e mammal guidelines will be required by the permitting agencies for all in water construction and structures. Because the area has reefs containing Acroporapalmata and A cervicornis,Orbicella spp.Dendrogyra and Mycetophylla special coral surveys will be required by NMFS. It will be of the utmost importance to a
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
Entities connected to both Acroporapalmata and Public Hearings
the DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION