3
Shared Docs
3
Same-Page
3 / 3
Mentions
tension which would be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernatorial and legislative approval is dependent on lobbying. The USACOE appli
ether there is any merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernatorial and legislative approval is dependent on lobbying. The USACOE appli
tension which would be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
approval. At present the permit is first presented to the Committee on Environmental Protection and then if approved by the committee forwarded to the Body of the Whole. We may be required to appear at both hearings. The timing on the gubernatorial and legislative approval is dependent on lobbying. The USACOE appli
Entities connected to both the U.S. COE and the Body of the Whole
Location of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONMycetophylla
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONCable Lay Monitoring
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONErika Kellerhals
PERSONFormal Section 7 Consultation
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATION