tension which would be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
w that we are minimizing impacts to the greatest extent possible while making the dock practical and safe for use to service the existing compound. Electrical Cable from Great Bay I have just finished permitting and installing the viNGN cable in Great Bay that goes to St. Croix. When I developed that route, I p
ether there is any merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
if not, it would be a good solution. There may also be another site in the north facing bay which might be suitable. I would like to look at both. Electrical Cable from GSJ I know we can find a workable mute from GSJ. I want to bring the cable over to the east side of GSJ and cut across heading a little north
tension which would be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
t all one time they will probable roll the dock extension into the new permit as well when they permit move the existing dock into the new permit. Electrical Cable from Great Bay I have just finished permitting and installing the viNGN cable in Great Bay that goes to St. Croix. When I developed that route, I p
Entities connected to both the U.S. COE and Electrical Cable
Location of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONMycetophylla
PERSONUtilities
ORGANIZATION
San Juan
LOCATIONCable Lay Monitoring
ORGANIZATIONThe Lump Sum Cost of
ORGANIZATIONErika Kellerhals
PERSONFormal Section 7 Consultation
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATION
Sarah Ferguson
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATION