th Mr. Epstein to select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
e re- formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 37,500.00. Cost for work
tension which would be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
e re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These V1411 be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 47,500.00. Cost for work
ether there is any merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 67,500.00. Cost for work
tension which would be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
he re-formatting of the document. This does not include reproduction cost of the document or cost of public notices. These will be billed at cost. The Lump Sum Cost of the Environmental Assessment Report, COE, CZM and WQC applications and associated studies, meetings and hearings will be $ 82,500.00. Cost for work
Entities connected to both the U.S. COE and The Lump Sum Cost of
the DPNR State Historic Preservation Officer
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION