th Mr. Epstein to select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
e do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
tension which would be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
ether there is any merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
tension which would be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental st
e to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
Entities connected to both the U.S. COE and Major Coastal Zone Management
Description of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONUtilities
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATION