4
Shared Docs
4
Same-Page
4 / 4
Mentions
251 $ =,761.00 815 Lighting System $ =,740.00 829 Engineering / Certification / structural =amp; elect. $ 85,490.00 $ 251,310.00 options Options 1 Bid Price 809 Metal Plating $ 56,470.00 Options 2 Bid Price 405 Inner Window Shades $ 38,640.00 Options 3 Bid Price 813 LJSB Ports $ 10
611 Aft Lavatory R/H Closet (toilet paper) $ =,071.00 814 110 VAC Outlets (fwd crew galley) 9 EFTA_R1_01888765 EFTA02649251 $ =,761.00 815 Lighting System $ =,740.00 829 Engineering / Certification / structural =amp; elect. $ 85,490.00 $ 251,310.00 options Options 1 Bid Price 809 Metal Platin
m $ 6,740.00 829 Engineering / Certification / structural40 & elect. $ 85,490.00c=> $ 251,310.00 9 EFTA_R1_01888809 EFTA02649287 options Options 1 Bid Price 809 Metal Platinga> $ 56,470.00a> Options 2 Bid Price 405 Inner Window Shades=/p> $ 38,640.00<=> Options 3 Bid Price 813 USB Por
lit, ca=ity) $ 5,490.00 611 Aft Lavatory R/H Closet (toilet paper)</=pan> $ 2,071.00 814 110 VAC Outlets (fwd crew galley)=u> $ 3,761.00 815 Lighting System $ 6,740.00 829 Engineering / Certification / structural40 & elect. $ 85,490.00c=> $ 251,310.00 9 EFTA_R1_01888809 EFTA02649287 options O
ystem $ 6,740.=0 829 Engineering / Certification / structural =& elect. $ 85,490.00 $ 251,310.00 7 EFTA_R1_01890015 EFTA02649970 options Options 1 Bid Price 809 Metal Plating $ 56,470.00 Options 2 Bid Price 405 Inner Window Shades $ 38,640.00 Options 3 Bid Price 813 USB Ports $ 10,
(split, cavity)<=> $ 5,490.=0 611 Aft Lavatory R/H Closet (toilet paper)<=> $ 2,071.=0 814 110 VAC Outlets (fwd crew galley) $ 3,761.=0 815 Lighting System $ 6,740.=0 829 Engineering / Certification / structural =& elect. $ 85,490.00 $ 251,310.00 7 EFTA_R1_01890015 EFTA02649970 options Optio
galley) $ 3,761.00 815 Lighting System $ 6,740.00 829 Engineering / Certification / structural & elect. $ 85,490.00 $ 251,310.00 options Options 1 Bid Price 809 Metal Plating $ 56,470.00 7 EFTA_R1_01387266 EFTA02377057 Options 2 Bid Price 405 Inner Window Shades $ 38,640.00 Options
Shroud (split, cavity) $ 5,490.00 611 Aft Lavatory R/H Closet (toilet paper) $ 2,071.00 814 110 VAC Outlets (fwd crew galley) $ 3,761.00 815 Lighting System $ 6,740.00 829 Engineering / Certification / structural & elect. $ 85,490.00 $ 251,310.00 options Options 1 Bid Price 809 Metal Plating $
Entities connected to both Options 1 and Lighting System
Jumpseat
LOCATION
Eric Trump
PERSON
Ronkonkoma
LOCATIONEric Roth
PERSON
Jeffrey Epstein
PERSONAft L/H Galley
ORGANIZATIONGalley Area
LOCATIONR/H & L/H PSU / Valance Panels
ORGANIZATIONGlareshield
LOCATIONPotty Seat & Shroud
ORGANIZATIONWindow Line
ORGANIZATIONEntrance Area
LOCATIONCockpit Area
LOCATIONHangar Rent
LOCATION
Marc Rich
PERSON
Richard Kahn
PERSON
Long Island
LOCATIONMain Cabin
LOCATIONRev 2 to Rev 3
ORGANIZATION801 Remove Interior / Inc. Inspection
ORGANIZATION