4
Shared Docs
4
Same-Page
4 / 4
Mentions
ii) Floats and hardware on island. Fabrication to commence once new dock complete — on hold woodshop concentrating on new gym & heli hut. 4 NC 3. Lookout House (Blue) Retaining Wall iii) On hold — woodshop concentrating on new gym & heli hut. •4 NC 4. Build Side screen MBR & Move Steps iv) On hold — wo
s to be included in the cable installation proposal. Due to be received by Darren today (11/10) and on second conference call today 11/10 betw NS, Darren & Paul Gandy, Paul advised he had misunderstood and assured us that he would send the memo to Darren on Monday 14 Oct. ******************** EFTA00577632
ii) Floats and hardware on island. Fabrication to commence once new dock complete — on hold woodshop concentrating on new gym & heli hut. + NC 3. Lookout House (Blue) Retaining Wall iii) On hold — woodshop concentrating on new gym & heli hut. + NC 4. Build Side screen MBR & Move Steps iv) On hold — woo
s to be included in the cable installation proposal. Due to be received by Darren today (11/10) and on second conference call today 11/10 betw NS, Darren & Paul Gandy, Paul advised he had misunderstood and assured us that he would send the memo to Darren on Monday 14 Oct. ******************** EFTA00577801
ii) Floats and hardware on island. Fabrication to commence once new dock complete — on hold woodshop concentrating on new gym & heli hut. + NC 3. Lookout House (Blue) Retaining Wall iii) On hold — woodshop concentrating on new gym & heli hut. + NC 4. Build Side screen MBR & Move Steps iv) On hold — woo
s to be included in the cable installation proposal. Due to be received by Darren today (11/10) and on second conference call today 11/10 betw NS, Darren & Paul Gandy, Paul advised he had misunderstood and assured us that he would send the memo EFTA00577819 FORTNIGHTLY REPORT FRIDAY 11 OCTOBER STATUS ITEM C
ii) Floats and hardware on island. Fabrication to commence once new dock complete — on hold woodshop concentrating on new gym & heli hut. 4 NC 3. Lookout House (Blue) Retaining Wall iii) On hold — woodshop concentrating on new gym & heli hut. 4 NC 4. Build Side screen MBR & Move Steps iv) On hold — woo
s to be included in the cable installation proposal. Due to be received by Darren today (11/10) and on second conference call today 11/10 betw NS, Darren & Paul Gandy, Paul advised he had misunderstood and assured us that he would send the memo to Darren on Monday 14 Oct. + Update 39. Pond Clear / Algae Eater
Entities connected to both Lookout House and Darren & Paul Gandy

Ghislaine Maxwell
PERSON
Jeffrey Epstein
PERSONMiles
PERSON
Oliver Stone
PERSONJE sd
ORGANIZATIONDarren Indyke
PERSONRockwell Group
ORGANIZATIONBoudoir
LOCATION
Marc Rich
PERSONColoured Boards
ORGANIZATIONPinto
PERSONPascal
PERSON
Puerto Rico
LOCATIONValdson Cotrin
PERSON
Prince Charles
PERSONSerge
PERSONCurtain Rod
PERSONEd Tuttle
PERSON
Zorro
LOCATIONBastion
ORGANIZATION