5
Shared Docs
5
Same-Page
5 / 5
Mentions
,620.00 304 Airstair Treatment $ =nbsp; 4,580.00 311 Fwd =avatory Upper Sidewall Panel $ =,098.00 314 R/H Fwd Lay Potty Seat $ =,533.00 320 Jumpseat $ =,425.00 325 =loor Covering (Entryway) $ =,272.00 400 Main =abin Area Price 401 =eadliner Panels $ =,825.00 402 R/H =amp; L/H PSU / Val
galley) $ =,761.00 815 =ighting System $ =,740.00 829 =ngineering / Certification / structural & elect. $ =5,490.00 $ 251,310.00 options Options 1 Bid Price 809 Metal Plating $ 56,470.00 Options 2 Bid Price 405 =nner Window Shades $ =8,640.00 Options 3 Bid Price 8 EFTA_R1_01888616
,620.00 304 Airstair Treatment $ =nbsp; 4,580.00 311 Fwd Lavatory Upper Sidewall Panel $ =,098.00 314 R/H Fwd Lay Potty Seat $ =,533.00 320 Jumpseat $ =,425.00 325 Floor Covering (Entryway) $ =,272.00 400 Main Cabin Area Price 401 Headliner Panels $ =,825.00 402 R/H & L/H PSU / Valance
251 $ =,761.00 815 Lighting System $ =,740.00 829 Engineering / Certification / structural =amp; elect. $ 85,490.00 $ 251,310.00 options Options 1 Bid Price 809 Metal Plating $ 56,470.00 Options 2 Bid Price 405 Inner Window Shades $ 38,640.00 Options 3 Bid Price 813 LJSB Ports $ 10
,620.00 304 Airstair Treatment $ 4,580.00 311 Fwd Lavatory Upper Sidewall Panel=u> $ 1,098.00 314 R/H Fwd Lay Potty Seat</=> $ 2,533.00 320 Jumpseat $ 8,425.00 325 Floor Covering (Entryway)<=> $ 1,272.00 400 Main C=bin Area Pr=ce 401 Headliner Panels $ 9,825.00 402 R/H & L/H PSU / Vala
m $ 6,740.00 829 Engineering / Certification / structural40 & elect. $ 85,490.00c=> $ 251,310.00 9 EFTA_R1_01888809 EFTA02649287 options Options 1 Bid Price 809 Metal Platinga> $ 56,470.00a> Options 2 Bid Price 405 Inner Window Shades=/p> $ 38,640.00<=> Options 3 Bid Price 813 USB Por
2,620.=0 304 Airstair Treatment<=p> $ 4,580.=0 311 Fwd Lavatory Upper Sidewall Panel $ 1,098.=0 314 R/H Fwd Lay Potty Seat $ 2,533.=0 320 Jumpseat $ 8,425.=0 325 Floor Covering (Entryway)=/p> $ 1,272;41 400 Main Cabin Area</=> Price 401 Headliner Panels $ 9,825.=0 402 R/H & L/H PSU /
ystem $ 6,740.=0 829 Engineering / Certification / structural =& elect. $ 85,490.00 $ 251,310.00 7 EFTA_R1_01890015 EFTA02649970 options Options 1 Bid Price 809 Metal Plating $ 56,470.00 Options 2 Bid Price 405 Inner Window Shades $ 38,640.00 Options 3 Bid Price 813 USB Ports $ 10,
s $ 2,620.00 304 Airstair Treatment $ 4,580.00 311 Fwd Lavatory Upper Sidewall Panel $ 1,098.00 314 R/H Fwd Lay Potty Seat $ 2,533.00 320 Jumpseat $ 8,425.00 325 Floor Covering (Entryway) $ 1,272.00 2 EFTA_R1_01387261 EFTA02377052 400 Main Cabin Area Price 401 Headliner Panels $ 9
galley) $ 3,761.00 815 Lighting System $ 6,740.00 829 Engineering / Certification / structural & elect. $ 85,490.00 $ 251,310.00 options Options 1 Bid Price 809 Metal Plating $ 56,470.00 7 EFTA_R1_01387266 EFTA02377057 Options 2 Bid Price 405 Inner Window Shades $ 38,640.00 Options
Entities connected to both Jumpseat and Options 1
Eric Roth
PERSON
Eric Trump
PERSON
Jeffrey Epstein
PERSON
Ronkonkoma
LOCATIONGalley Area
LOCATIONAft L/H Galley
ORGANIZATIONGlareshield
LOCATIONPotty Seat & Shroud
ORGANIZATIONLighting System
ORGANIZATIONCockpit Area
LOCATIONEntrance Area
LOCATIONWindow Line
ORGANIZATIONR/H & L/H PSU / Valance Panels
ORGANIZATION
Long Island
LOCATION
Richard Kahn
PERSON
Marc Rich
PERSON801 Remove Interior / Inc. Inspection
ORGANIZATIONUSB Ports
ORGANIZATIONMain Cabin
LOCATIONHangar Rent
LOCATION