3
Shared Docs
3
Same-Page
3 / 3
Mentions
Subbase Drydock Inc. PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 T:(340) 776-2078 Fax:(340)779-8426 Invoice Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LL
see what can me reused vs. replaced. We have been informed that the present pump is in good condition so we are not quoting on replacement of pump. Labor and Materials will be 535-45,000. The steel boxes that secure the cylinders to the hull are deteriorated and will need replacement. Subbase recommends using stai
Subbase D dock Inc. T: PO Box 4429/ Parcel 162 Subbase Invoice Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail P.O. No. Project Terms W
c tank, Subbase reccomends replacing tank with new marine grade aluminum tank complete with all necessary fittings and sight glass to view levels. Labor and Materials. 21.) Engine Room Wiring: Upon an inspection of the engine room. Subbase Drydock has determined that all of the engine room wiring is compromised.
Subbase Drydock Inc. PO Box 4429/ Parcel 162 Subbase St. Thomas, USVI, 00803 T:(340) 776-2078 Fax:(340)779-8426 Invoice Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LL
see what can me reused vs. replaced. We have been informed that the present pump is in good condition so we are not quoting on replacement of pump. Labor and Materials will be 535-45,000. The steel boxes that secure the cylinders to the hull are deteriorated and will need replacement. Subbase recommends using stai
Entities connected to both PO Box 4429/ Parcel and Labor and Materials