uired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
importance to avoid reefs to reduce the potential of having to engage in formal BIOIMPACT, INC. Page 2 EFTA00583317 Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Wate
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
ired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
quired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federa
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
Entities connected to both the Federal Agencies and Public Hearings
Utilities
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONInteragency Meeting
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATION