uired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1
ms and Requests for additional information • Follow through with agencies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA)
importance to avoid reefs to reduce the potential of having to engage in formal BIOIMPACT, INC. Page 2 EFTA00583317 Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Wate
ms and Requests for additional information • Follow through with agencies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA)
ired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require
ms and Requests for additional information • Follow through with agencies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA)
quired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federa
ms and Requests for additional information • Follow through with agencies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA)
Entities connected to both the Federal Agencies and Interagency Meeting
Utilities
ORGANIZATIONDescription of Project
ORGANIZATIONLocation of Any Critical Areas or Possible Trouble Spots
ORGANIZATIONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUSACOE
ORGANIZATIONErika Kellerhals
PERSONthe Water Quality Monitoring Plan
ORGANIZATIONPublic Hearings
ORGANIZATIONFormal Section 7 Consultation
ORGANIZATIONCable Lay Monitoring
ORGANIZATIONthe Coastal Zone
LOCATIONVIWAPA
ORGANIZATIONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONFerguson Kroblin
PERSONHistoric Land
LOCATIONLandforms, Geology, Soils
ORGANIZATIONTerrestrial Resources
ORGANIZATIONAir Quality
ORGANIZATION