4
Shared Docs
4
Same-Page
4 / 4
Mentions
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
Parts On Island on GSJ On Island 102 89 R/0 Water Michael & Smiley Water Testing 5f24 Anna emalled last test results (3/2017). TZ 103 104 Lighting & Electrical rn 105 106 90 91 Cabanas 1-4 Flagpole Pool Danny & Keshawn Danny & Keshawn Dimmers Dimmers Install Dimmers Dimmers not working properly
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
& Gemini eawater Systems R/O Parts On Island 102 99 R/O Water Smiley Water Testing 5/24 Anna °mailed last toot results (3/2017). 103 104 Lighting & Electrical 105 90 Cabanas 1-4 Dimmers Install Dimmers 106 91 Flagpole Pool Dimmers Dimmers not working properly 107 92 MC New Planter MC Planter &
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
EDA to production completion 7/5. EDA to Tropical FL 7/12. EDA on STT 7/21 On Island on GSJ On Island 5/24 'nailed last test results (3/2017). Lighting & Electrical Install Dimmers Dimmers not working properly In progress Add Lighting to Water Fountain. Ordered 5/23; seri,. arrive at the PB house on Thursda
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
l & Gemini Seawater Systems RIO Parts On Island H 89 R/O Water Michael & Smiley Water Testing 5/24 Anna emailed last test results (3/2017). Lighting & Electrical 90 Cabanas 1-4 Danny & Keshawn Dimmers Install Dimmers C 91 Flagpole Pool Danny & Keshawn Dimmers Dimmers not working properly 92 MC New
Entities connected to both Tropical Shipping STT and Lighting & Electrical
Yacht
ORGANIZATIONBench
ORGANIZATIONJohn Deere
PERSONInsurance Coverage & Repairs
ORGANIZATION
Julie K. Brown
PERSON
Robert Gates
PERSONBarge
PERSONYeti Solar
PERSON
Caterpillar
ORGANIZATIONLeon Black
PERSONFlanders
LOCATION
Palm Beach
LOCATIONNew Planter
LOCATIONIsland Wide
LOCATIONMuffler Rubber mount
LOCATIONAllied
ORGANIZATIONTunnel, Engineering & Heli
ORGANIZATION
Oliver Stone
PERSONTwin Bedroom
ORGANIZATIONNC Unit
ORGANIZATION