4
Shared Docs
4
Same-Page
4 / 4
Mentions
on STT 5/28 - cleared. off-loaded, awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. Request moorings for Christmas Cove Sell
6/5). A complete service was performed on the Denali and the rear brake pads changed. Carlos will schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. Carlos awaiting estimate from Cliff's Auto Repair - by 5/31. Carlos will take the vehicle to Guardian 5/30 for adjuster's inspection.
off-loaded, awaiting pickup for transport to LSJ. 38 Dock GSJ Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock 39 Dock LSJ Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. 40 Christmas Cove
5). A complete service was performed on the Denali and the rear brake pads changed jaMvill schedule the hose install once the part arrives. ill aw Insurance Coverage & Repairs to he made ailing estimate from Cliffs Auto Repair - by 5/31. Carlos wi I to e t e vehicle to Guardian 5/30 for adjusters inspection. Pools & Pow
off-loaded. awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ 38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently 39 Dock LSJ Perrrits under review by CZM. 40 Christmas Cove
iness days (6/5). A complete se-vice was performed on the Denali and the rear brake pads changed. schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. awaiti etsotimate from 011is Auto Repair - by 5/31. will take the yeni ns e Guardian 5/30 for adjuster's inspection. Pods & Power Wa
awaiting pickup for transport to LSJ. 38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock •• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. i.
6/5). A complete service was performed on the Denali and the rear brake pads changed. Carlos will schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. Carlos awaiting estimate from Cliff's Auto Repair - by 5131. Carts will take the vehicle to Guardian 5/30 for adjuster's Inspection. P
Entities connected to both Christmas Cove Service Dock and Insurance Coverage & Repairs
Banquette
ORGANIZATIONBench
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATIONJohn Deere
PERSON
Julie K. Brown
PERSON
Robert Gates
PERSONBarge
PERSONYeti Solar
PERSON
Caterpillar
ORGANIZATIONLeon Black
PERSONFlanders
LOCATION
Palm Beach
LOCATIONNew Planter
LOCATIONIsland Wide
LOCATIONMuffler Rubber mount
LOCATIONAllied
ORGANIZATIONTunnel, Engineering & Heli
ORGANIZATION
Oliver Stone
PERSONTwin Bedroom
ORGANIZATIONNC Unit
ORGANIZATION