on STT 5/28 - cleared. off-loaded, awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. Request moorings for Christmas Cove Sell
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
off-loaded, awaiting pickup for transport to LSJ. 38 Dock GSJ Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock 39 Dock LSJ Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. 40 Christmas Cove
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
off-loaded. awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ 38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently 39 Dock LSJ Perrrits under review by CZM. 40 Christmas Cove
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
awaiting pickup for transport to LSJ. 38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock •• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. i.
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
Entities connected to both Christmas Cove Service Dock and Tropical Shipping STT
Yacht
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATIONJohn Deere
PERSONInsurance Coverage & Repairs
ORGANIZATION
Julie K. Brown
PERSON
Robert Gates
PERSONBarge
PERSONYeti Solar
PERSON
Caterpillar
ORGANIZATIONLeon Black
PERSONFlanders
LOCATION
Palm Beach
LOCATIONNew Planter
LOCATIONIsland Wide
LOCATIONMuffler Rubber mount
LOCATIONAllied
ORGANIZATIONTunnel, Engineering & Heli
ORGANIZATION
Oliver Stone
PERSONTwin Bedroom
ORGANIZATIONNC Unit
ORGANIZATION