4
Shared Docs
4
Same-Page
4 / 4
Mentions
J Dock Exported an June 9.2019 933.34 PM BOT Michael & Contractors Amy Dempsey Amy Dempsey Patrick Michael & Bill Terry Michael & Contractors Franks Electric Peter Elie Michael & Contractors Michael & Jules Michael & Jules Michael & Paul "Global Tech' Amy Dempsey Michael Michael Michael Sylveste
on STT 5/28 - cleared. off-loaded, awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. Request moorings for Christmas Cove Sell
38 Dock LSJ Permits 39 Christmas Cove Moorings Moonngs 40 Old Generators Old Generators 41 Flagpole Pool Shade Structure 42 Five Palms Franks Electric 43 Five Palms Concrete 44 GSJ Ft./O Contractors 2nd R/O Intake 45 GSJ New Dock Dock Expansion 46 GS.) New Dock Water Sport Ramp 47 LSJ
off-loaded, awaiting pickup for transport to LSJ. 38 Dock GSJ Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock 39 Dock LSJ Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. 40 Christmas Cove
Structure Sell Generators: to coordinate sale of the old generators, o speak with Shade structure is replacing need fcr awning. 43 Five Palms Franks Electric I Electrical work to be done at Five Palms 44 Five Palms Concrete Need more direction from JE. He was not pleased with current layout. 45 GSJ
off-loaded. awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ 38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently 39 Dock LSJ Perrrits under review by CZM. 40 Christmas Cove
ck Exporters on Juno 6. 2019 6 07 52 ALl BOT Michael & Contractors Amy Dempsey Amy Dempsey Patrick Michael & Bill Terry Michael & Contractors Franks Electric Peter Elie Michael & Contractors Michael & Jules Michael & Jules Michael & Paul "Global Tech" Amy Dempsey Michael Michael Sylvester & James
awaiting pickup for transport to LSJ. 38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock •• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. i.
Entities connected to both Franks Electric and Christmas Cove Service Dock
Yacht
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATIONJohn Deere
PERSONInsurance Coverage & Repairs
ORGANIZATION
Julie K. Brown
PERSON
Robert Gates
PERSONBarge
PERSONYeti Solar
PERSON
Caterpillar
ORGANIZATIONLeon Black
PERSONFlanders
LOCATION
Palm Beach
LOCATIONNew Planter
LOCATIONIsland Wide
LOCATIONMuffler Rubber mount
LOCATIONAllied
ORGANIZATIONTunnel, Engineering & Heli
ORGANIZATION
Oliver Stone
PERSONTwin Bedroom
ORGANIZATIONNC Unit
ORGANIZATION