4
Shared Docs
4
Same-Page
4 / 4
Mentions
ar. pickup equipment 6/12 - Seth and crew (2-3) arrive 6112 - mediation begins 6/13. (5) areas on GSJ 1. Mike's Room, 2. Living Room. 3. Office. 4. Twin Bedroom, 5. Master Bedroom. 0 (2) areas on LSJ1. Kitchen 2. Theater. Should be added - 3. Gym. 0 2 LSJ MC Kitchen Karyna & JE Banquette Project ON HO
6/5). A complete service was performed on the Denali and the rear brake pads changed. Carlos will schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. Carlos awaiting estimate from Cliff's Auto Repair - by 5/31. Carlos will take the vehicle to Guardian 5/30 for adjuster's inspection.
11. Clear. pickup equipment 6/12 - Seth and crew (2-3) arrive 6/12 - remediation begins 6/13. (5) areas on GSJ 1. Room, 2. Living Room, 3. Onice.4. Twin Bedroom, 5. Master Bedroom. (2) areas on LSJ1. Kitchen 2. Theater. Should be added - 3. Gym. Project ON HOLD until the decorators come, per JE. Will review
5). A complete service was performed on the Denali and the rear brake pads changed jaMvill schedule the hose install once the part arrives. ill aw Insurance Coverage & Repairs to he made ailing estimate from Cliffs Auto Repair - by 5/31. Carlos wi I to e t e vehicle to Guardian 5/30 for adjusters inspection. Pools & Pow
IT 6/11. Clear, pickup equipment 6/12 - Seth an (2-3) arrive 6/12 - remediation begins 6/13. (5) areas on GSJ 1. Room, 2. Living Room, 3. Office,'. Twin Bedroom, 5. Master Be (2) areas on LSJ1. Kitchen 2. Theater. Should be added - 3. Gym. Project ON HOLD until the decorators come, per JE. Will review with
iness days (6/5). A complete se-vice was performed on the Denali and the rear brake pads changed. schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. awaiti etsotimate from 011is Auto Repair - by 5/31. will take the yeni ns e Guardian 5/30 for adjuster's inspection. Pods & Power Wa
r, pickup equipment 6/12 - Seth and crew (2-3) arrive 6/12 - remediation begins 6/13. (5) areas on GSJ 1. Mike's Room, 2. Living Room, 3. Office,4. Twin Bedroom. 5. Master Bedroom. _J 2 LSJ MC Kitchen Karyna & JE Banquette (2) areas on LSJ 7. Kitchen 2. Theater. Should be added - 3. Gym. Project ON HOL
6/5). A complete service was performed on the Denali and the rear brake pads changed. Carlos will schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. Carlos awaiting estimate from Cliff's Auto Repair - by 5131. Carts will take the vehicle to Guardian 5/30 for adjuster's Inspection. P
Entities connected to both Twin Bedroom and Insurance Coverage & Repairs
Yacht
ORGANIZATIONBanquette
ORGANIZATIONChristmas Cove
LOCATIONAllied
ORGANIZATION
Jeffrey Epstein
PERSONBench
ORGANIZATION
Palm Beach
LOCATION
Oliver Stone
PERSON
Samantha Power
PERSONOrder Pesticides & Fertilizer
ORGANIZATION
Robert Gates
PERSONBlue Ocean Tackle Inc.
ORGANIZATIONLighting & Electrical
ORGANIZATIONTrenching Area & Description
ORGANIZATIONTropical Shipping STT
ORGANIZATIONLeon Black
PERSONChristmas Cove Service Dock
ORGANIZATIONFranks Electric
ORGANIZATIONMB Bath
ORGANIZATIONHelipad Office
ORGANIZATION